Loading...
Tops Project Planning Pad with Margin Task List  by  Tops Business Forms
Product Size & Specification
Product Specs:
X
Calendars & Refills Included
In Stock!
1
items selected total price:
$17.02

  • Find out about this brand!
  • Shipping: Small Parcel - FREE!
    Shipping Time: Ships between
    1 and 2 days
    , estimated between
    Fri Jun 21 and Mon Jun 24
    Details:
    item number: 341225 | phone code: 641B-43F5 |
    #14 in 

  • Project Planning Pads are designed for project managers and supervisors in any field. Each lined sheet features a wide margin and an unruled box labeled "task list" at the bottom. The back of each sheet is grid-ruled with 4 squares per inch. Top of each sheet provides space for a date, project title and page number for easy reference. Planning pads have Letr-Trim perforation for clean and easy sheet removal. Heavyweight paper prevents bleed-through to next sheet. Extra-thick backer supports writing without a desktop or clipboard. 40 sheets per pad.


    Packaged Quantity: 1 / Pack
    Product Type: Planner
    Media Quantity: 40 x Sheet
    Media Size: 8.50" x 11.75"
    Features: Perforated
    Color: White Paper
    Material: Chipboard
    Weight (Approximate): 20 lb - Paper Weight
    Additional Information:
  • 38 Lines Per page
  • Wide Blue Ruling

  • Recycled: No
    Recycled Content: 0%
    Post-consumer-waste%: 0%
    Assembly Required: No
  • Related Items
  • Rating: 0

Previously Viewed